7 Module Loadout ICA FLUOR
12 month platform/module loadout project
7 Module Loadout Project.
JVV was hired to carry out the logistics for these 7 modules loadouts representing bothe the transport charterer and the heavy lift project team.
We were able to coordinate efficiently the logistics to keep the project on time and respond to any situation as it occured. These projects can be challenging.
On Time Logistics
Logistics were organised with efficiency and on time orientated management.
Experienced staff
Our staff was available 24 hours per day - on site during the loadout.
High quality Reporting
For each loadout we documented every stage, time and action, with factual reporting and photographic record.